top of page

Are Your FRM Processes Actually in Control - or Just Busy?

  • FRM Info
  • 1 day ago
  • 1 min read

Here's an uncomfortable question: when you tweak a roster to reduce fatigue risk, how do you know you've actually improved anything — and not just reacted to noise?


A Jeppesen white paper borrows a lesson from 1930s manufacturing to answer that. The short version: the industry abandoned end-of-line inspection decades ago because it was expensive, slow, and missed the point entirely. Sound familiar?


If you're using a fatigue model mainly as a pass/fail gate at the end of scheduling, you might be running the same playbook.


The paper makes a compelling case for applying Statistical Process Control to FRM - treating crew planning as the production process it actually is, tracking meaningful metrics over time, and telling the difference between a real trend and random variation. It introduces Normalised Fatigue Risk (NFR) as a metric built for exactly this purpose.


It's a short read. The question it leaves you with is not. Read the paper here.

Recent Posts

See All
From Firefighting to Engineering

Imagine two airlines. The first spends much of its time firefighting. Fatigue reports arrive, high-risk duties are identified, schedules are adjusted, and mitigations are applied. The team works hard,

 
 
 

Comments


bottom of page